Ibiza’s waste transfer station will be renovated to handle the growing demand of separate waste collection and to respond to the spike in waste generated in summer. The plan seeks to upgrade equipment, expand storage capacity and optimise operations in order to strengthen the island’s circular economy.
Remodelling project for Ibiza’s waste transfer station
Ibiza (Eivissa)
Consell Insular d'Eivissa
Consell Insular d'Eivissa
ITS2425-099
2.646.798 €
2.234.434 €
1.156.399 €
2024-2025
In execution
Environment
Executed: 51.75%
25.02.2026
Project to promote sustainable mobility and its connection with public transport.
Mallorca, Menorca
1.500.000 €
Status: Not started
The fibre cement section between the WWTP and WWPS has been replaced to improve the service
Menorca
322.635 €
Status: Executed
Measure seeks to compensate for the additional costs of production in the Serra de Tramuntana mountain range
Mallorca
1.300.000 €
Status: Executed