The remodelling of the Sóller drinking water treatment plant (DWTP) includes new disinfection systems and improves the chlorination of the municipal water tank. The aim of the plan is to ensure the quality of the water collected from the Torrent Major Stream before being distributed for human consumption.
Remodelling of the Sóller drinking water treatment station (ETAP) and the adaptation of the reservoir’s chlorinated system
Mallorca (Sóller)
Govern de les Illes Balears
Agència Balear de l'Aigua i la Qualitat Ambiental (ABAQUA)
ITS2016-019
285.460 €
285.460 €
233.467 €
2016
Executed
Environment
Executed: 81.79%
26.09.2023
Vegetation treatments to slow the spread of wildfires in critical areas
Mallorca, Menorca, Ibiza, Formentera
456.630 €
Status: Executed
The municipality has added zero-emission vehicles to modernise the water service
Mallorca
58.080 €
Status: Executed
Plan to improve the value chain from unloading to the end consumer
Mallorca
2.446.500 €
Status: In execution