The remodelling of the Sóller drinking water treatment plant (DWTP) includes new disinfection systems and improves the chlorination of the municipal water tank. The aim of the plan is to ensure the quality of the water collected from the Torrent Major Stream before being distributed for human consumption.
Remodelling of the Sóller drinking water treatment station (ETAP) and the adaptation of the reservoir’s chlorinated system
Mallorca (Sóller)
Govern de les Illes Balears
Agència Balear de l'Aigua i la Qualitat Ambiental (ABAQUA)
ITS2016-019
285.460 €
285.460 €
233.467 €
2016
Executed
Environment
Executed: 81.79%
26.09.2023
Three major valves replaced to improve water control in Pla de Mallorca’s main supply network
Mallorca
193.600 €
Status: Executed
Updating of the drinking water network and burying of infrastructures to improve the urban landscape in Moscari.
Mallorca
157.551 €
Status: Executed
Planícia public estate is preparing to accommodate hikers along the Ruta de Pedra en Sec trail
Mallorca
475.742 €
Status: In execution