The remodelling of the Sóller drinking water treatment plant (DWTP) includes new disinfection systems and improves the chlorination of the municipal water tank. The aim of the plan is to ensure the quality of the water collected from the Torrent Major Stream before being distributed for human consumption.
Remodelling of the Sóller drinking water treatment station (ETAP) and the adaptation of the reservoir’s chlorinated system
Mallorca (Sóller)
Govern de les Illes Balears
Agència Balear de l'Aigua i la Qualitat Ambiental (ABAQUA)
ITS2016-019
285.460 €
285.460 €
233.467 €
2016
Executed
Environment
Executed: 81.79%
26.09.2023
The project promotes agricultural investment to improve productivity, savings and resilience
Mallorca, Menorca, Ibiza, Formentera
6.000.000 €
Status: Executed
Project aimed at providing subsidies to guarantee the supply of urban drinking water in the Balearic Islands
Mallorca, Menorca, Ibiza, Formentera
20.000.000 €
Status: In execution
The plan seeks to protect public oak and pine forests against droughts and fires
Mallorca, Menorca, Ibiza, Formentera
620.125 €
Status: Executed