The construction of a new drinking water pipeline between Maria de la Salut and Petra is part of a strategy to increase water supply in Pla de Mallorca. The plan includes regulation tanks, as well as new control and connection infrastructure to ensure supply and reduce pressure on overused groundwater reservoirs.
Maria de la Salut - Petra pipeline project
Mallorca (Maria de la Salut, Petra)
Govern de les Illes Balears
Agència Balear de l'Aigua i la Qualitat Ambiental (ABAQUA)
ITS2016-021
12.447.922 €
12.447.922 €
8.945.335 €
2016
Executed
Environment
Executed: 71.86%
14.04.2026
An action plan to restore ecological integrity and strengthen the conservation of fragile ecosystems
Mallorca, Menorca, Ibiza, Formentera
332.210 €
Status: Executed
Sewerage renovation in Es Ca Marí to improve water treatment and agricultural use of water
Formentera
1.250.000 €
Status: Started
Three major valves replaced to improve water control in Pla de Mallorca’s main supply network
Mallorca
193.600 €
Status: Executed