The Balearic Water Agency has upgraded major valves on the section of pipeline connecting Son Sitges, Maria de la Salut and Santa Maria del Camí. These works aim to improve water control in the main network, increase supply to several municipalities, and support the recharge of overused aquifers such as the one in Sa Marineta.
A project involving the replacement and installation of valves in the pipeline connecting Son Sitges, Maria de la Salut and Santa Maria del Camí
Mallorca (Llubí, Maria de la Salut, Santa Maria del Camí)
Govern de les Illes Balears
Agència Balear de l'Aigua i la Qualitat Ambiental (ABAQUA)
ITS2016-022
193.600 €
193.600 €
171.960 €
2016
Executed
Environment
Executed: 88.82%
26.09.2023
The design for the complete renovation of Mallorca’s main osmosis plant has been finalised
Mallorca
464.501 €
Status: Executed
Climate shelters and adapted urban spaces as a response to climate change
Mallorca, Menorca, Ibiza, Formentera
317.000 €
Status: In execution
The project aims to tackle flooding, leaks and accessibility issues in the town centre
Mallorca
787.104 €
Status: Executed