Portinatx faces the construction of a new wastewater treatment plant to replace outdated facilities from 1997. The plan responds to population growth and seeks to ensure adequate water treatment in line with European quality standards.
Construction of the new WWTP at Portinatx
Ibiza (Sant Joan de Labritja)
Consell Insular d'Eivissa
Ajuntament de Sant Joan de Labritja
ITS2018-103
4.259.176 €
2.129.588 €
94.279 €
2018
In execution
Environment
Executed: 4.43%
27.02.2026
Inca Town Council has upgraded local council vehicles to reduce emissions and noise
Mallorca
181.500 €
Status: Executed
A programme to support small sustainable farms that uphold traditional farming practices
Mallorca, Menorca, Ibiza, Formentera
1.123.459 €
Status: Executed
A detailed map to highlight, preserve and manage protected natural areas
Mallorca, Menorca, Ibiza, Formentera
785.000 €
Status: Executed