Portinatx faces the construction of a new wastewater treatment plant to replace outdated facilities from 1997. The plan responds to population growth and seeks to ensure adequate water treatment in line with European quality standards.
Construction of the new WWTP at Portinatx
Ibiza (Sant Joan de Labritja)
Consell Insular d'Eivissa
Ajuntament de Sant Joan de Labritja
ITS2018-103
4.259.176 €
2.129.588 €
94.279 €
2018
In execution
Environment
Executed: 4.43%
27.02.2026
The plan promotes a new tourism product tied to the island’s geological heritage
Mallorca, Menorca, Ibiza, Formentera
415.000 €
Status: In execution
The project restores marine monitoring stations across the four major islands to boost conservation
Mallorca, Menorca, Ibiza, Formentera
130.000 €
Status: Executed
Permanent centre to care for wildlife and manage exotic species in the Pityusic Islands
Ibiza
1.936.889 €
Status: In execution