Portinatx faces the construction of a new wastewater treatment plant to replace outdated facilities from 1997. The plan responds to population growth and seeks to ensure adequate water treatment in line with European quality standards.
Construction of the new WWTP at Portinatx
Ibiza (Sant Joan de Labritja)
Consell Insular d'Eivissa
Ajuntament de Sant Joan de Labritja
ITS2018-103
4.259.176 €
2.129.588 €
94.279 €
2018
In execution
Environment
Executed: 4.43%
27.02.2026
Vegetation treatments to slow the spread of wildfires in critical areas
Mallorca, Menorca, Ibiza, Formentera
456.630 €
Status: Executed
The Balearic Islands expands boating surveillance to prevent illegal anchoring and overcrowding
Mallorca, Menorca, Ibiza, Formentera
3.581.000 €
Status: In execution
A project to upgrade infrastructure, resolve long-standing issues and improve water sustainability
Menorca
393.149 €
Status: Executed