Portinatx faces the construction of a new wastewater treatment plant to replace outdated facilities from 1997. The plan responds to population growth and seeks to ensure adequate water treatment in line with European quality standards.
Construction of the new WWTP at Portinatx
Ibiza (Sant Joan de Labritja)
Consell Insular d'Eivissa
Ajuntament de Sant Joan de Labritja
ITS2018-103
4.259.176 €
2.129.588 €
94.279 €
2018
In execution
Environment
Executed: 4.43%
27.02.2026
Reforestation and conservation actions to improve the landscape and river ecosystems
Mallorca, Menorca, Ibiza, Formentera
95.000 €
Status: Executed
The plan promotes a new tourism product tied to the island’s geological heritage
Mallorca, Menorca, Ibiza, Formentera
415.000 €
Status: In execution
The project improves the sewage network and adapts the WWTP to current regulations
Mallorca
2.662.000 €
Status: Executed