The Santa Eulària des Riu desalination plant in Ibiza has completed the construction of an additional 5,000 m³ tank. The intervention, funded through sustainable tourism tax (ITS), brings storage capacity in line with daily production volume and improves the urban supply service.
Project for the expansion of the Santa Eulària des Riu desalination plant water reservoir
Ibiza (Santa Eulària des Riu)
Govern de les Illes Balears
Agència Balear de l'Aigua i la Qualitat Ambiental (ABAQUA)
ITS2016-025
1.939.287 €
1.939.287 €
1.245.722 €
2016
Executed
Environment
Executed: 64.24%
11.02.2021
The works complete a plan that had been unfinished since 2010, and improves the discharge to the sea
Menorca
736.837 €
Status: Executed
The project allows for two-way flow between Sa Marineta and s'Estremera and improves system control
Mallorca
439.230 €
Status: Executed
The plan will double the area of cultivated land and reinforce fire prevention in Ibiza
Ibiza
1.153.650 €
Status: In execution