Works carried out at Formentera’s desalination plant have improved the production capacity of drinking water through the installation of a new reverse osmosis frame, replacing the old one, which was defunct due to corrosion.
Remodelling works on the third production line of the sea water desalination plant in Formentera
Formentera (Formentera)
Govern de les Illes Balears
Agència Balear de l'Aigua i la Qualitat Ambiental (ABAQUA)
ITS2019-144
400.000 €
400.000 €
338.917 €
2019
Executed
Environment
Executed: 84.73%
10.02.2022
Climate shelters and adapted urban spaces as a response to climate change
Mallorca, Menorca, Ibiza, Formentera
317.000 €
Status: In execution
A plan for more efficient water use in farming and fewer discharges to groundwater
Mallorca
2.075.347 €
Status: Executed
Measure seeks to compensate for the additional costs of production in the Serra de Tramuntana mountain range
Mallorca
1.300.000 €
Status: Executed