With severe structural damage detected in the joists and pillars, the Costa d'en Blanes service reservoir will undergo a key refurbishment to prevent its irreversible deterioration. The project will guarantee the supply of drinking water to Calvià and Andratx by optimising resources and avoiding the construction of new infrastructure.
Rehabilitation of the Costa d'en Blanes water reservoir
Mallorca (Andratx, Calvià)
Conselleria de la Mar i del Cicle de l'aigua
Agència Balear de l'Aigua i la Qualitat Ambiental (ABAQUA)
ITSE2023-125
1.544.878 €
1.544.878 €
1.074.585 €
2023E
Executed
Environment
Executed: 69.56%
17.03.2026
The project plans to replace outdated pipes and bury infrastructure on Sor Maria dels Dolors street
Mallorca
157.551 €
Status: Executed
Mallorca Island Council takes over the Ses Porqueres building to make it a lodge within the island's dry-stone network
Mallorca
1.410.683 €
Status: Executed
This project treats groundwater to meet health and safety standards and protect public health
Menorca
624.916 €
Status: Executed