The two main drinking water tanks in Felanitx have structural losses that compromise water supply and lead to unaffordable waste. The local council has initiated technical works to repair and waterproof this infrastructure, with the aim of reducing the current volume of leaks, which is over 40%.
Improving the efficiency of the Felanitx water tanks
Mallorca (Felanitx)
Federació d'Entitats Locals de les Illes Balears
Ajuntament de Felanitx
ITSE2023-161
206.348 €
206.348 €
176.964 €
2023E
Executed
Environment
Executed: 85.76%
13.03.2026
The plan strengthens water quality through works on the DWTP and the water tank
Mallorca
285.460 €
Status: Executed
The desalination plant can now distribute treated water thanks to its connection to the primary network
Ibiza
1.939.287 €
Status: Executed
An island-wide plan is promoting sustainability through businesses that offer craft products
Mallorca
600.000 €
Status: In execution