The objective of the project is to build a new Waste Water Treatment Plant (WWTP) in Portinaxt to solve the problems at Sant Joan de Labritja, which does not have waste water treatment facilities that meet the current standards.
Ibiza (Sant Joan de Labritja)
Consell Insular d'Eivissa
Ajuntament de Sant Joan de Labritja
ITS2018-103
4.259.176 €
2.129.588 €
94.279 €
2018
In execution
Environment
Executed: 4.43%
11.08.2025
Construction of a new wastewater pumping station at Port d'Andratx
Mallorca
2.009.485 €
Status: Started
Repair and modernisation of the Felanitx water tanks to optimise supply and reduce water losses.
Mallorca
206.348 €
Status: In execution
Improvement of the reclaimed water network irrigation and cleaning in coastal areas, significantly reducing drinking water consumption.
Mallorca
432.244 €